Due to the conditions in the precast concrete plant and the gate factory, the creation of the foundation and the gate assembly are significantly more efficient, making them much more cost-effective.
All Advantages at a Glance
Strong added value
What are the advantages of a gate system with Hybrid Cube patent?
Inappropriate cable outlets are a thing of the past. Simply provide the 230V cable with a Schuko plug in the excavation, along with the conduit to the inlet – the rest is handled by the Hybridcube team.
No waiting time for foundation creation and drying – the delivery time for the entire assembly is only 8 weeks!
Skilled workers and qualified installers will be in short supply in the future – they can now be deployed elsewhere.
The accuracy and surface quality of a precast concrete foundation will ALWAYS be better than that of a foundation built on-site.
No coordination issues, as everything is handled by one provider (except for the foundation pit).
A transport is required anyway – with or without the foundation.
On-site assembly is completely eliminated, no drilling, no wiring, no commissioning.
Hybrid Cube works independently of gate type and style.
The prices for on-site foundation construction have doubled in recent years.
Weight reduction and resource conservation through steel beams in the center of the foundation.
Unpredictable issues are reduced: the system is 100% correctly assembled and commissioned.