Delivery and Commissioning
HYBRID CUBE
The delivery, placement, and commissioning of a Hybridcube gate system are completed within a single day and require minimal on-site construction effort. Once everything is prepared, the system is ready for operation in no time, without unnecessarily blocking the access route.
Step 1





Excavation
Approximately 5cm of compacted gravel
Level off with cable sand
Lay the 230V power supply cable with a Schuko plug in the excavation, ready for use.
Conduit to the inlet (without cable)
Schritt 2


Place the gate system in the excavation using a truck-mounted crane.
Schritt 3


Insert the 230V cable into the pillar.
Pull the connection cable to the inlet.
Plug in.