Delivery and Commissioning

HYBRID CUBE

The delivery, placement, and commissioning of a Hybridcube gate system are completed within a single day and require minimal on-site construction effort. Once everything is prepared, the system is ready for operation in no time, without unnecessarily blocking the access route.

Step 1

Excavation
Approximately 5cm of compacted gravel
Level off with cable sand
Lay the 230V power supply cable with a Schuko plug in the excavation, ready for use.
Conduit to the inlet (without cable)

Schritt 2

Place the gate system in the excavation using a truck-mounted crane.

Schritt 3

Insert the 230V cable into the pillar.
Pull the connection cable to the inlet.
Plug in.

Schritt 4

Compact the foundations with a rammer.
done!

Copyright © Schnabel EinfahrtstoreGmbH & Co. KG

Wir verwenden Cookies, um Inhalte und Anzeigen zu personalisieren, Funktionen für soziale Medien anbieten zu können und die Zugriffe auf unsere Website zu analysieren. Außerdem geben wir Informationen zu Ihrer Verwendung unserer Website an unsere Partner für soziale Medien, Werbung und Analysen weiter. Unsere Partner führen diese Informationen möglicherweise mit weiteren Daten zusammen, die Sie ihnen bereitgestellt haben oder die sie im Rahmen Ihrer Nutzung der Dienste gesammelt haben.

 